Bid Requests

 
DeSilva Gates Construction (DGC) is preparing a bid as a Prime Contractor for the project listed below:
 
PROJECT:        
SEDIMENT REMOVAL 2020 TISDALE BYPASS
SACRAMENTO RIVER FLOOD CONTROL PROJECT
Contract No. C51597, Specification No. 20-05
Small Business Enterprise Goal Assigned is 25%
 
OWNER:          
STATE OF CALIFORNIA – DEPARTMENT OF WATER RESOURCES
1416 Ninth Street, Room 418, Sacramento, CA 95814
 
BID DATE:  JUNE 02, 2020 @ 4:00 P.M.          
ESTIMATOR: JACK SHEWMAKER
 
DGC is soliciting quotations from certified Small Business Enterprises and Disabled Veteran Business Enterprises, for the following types of work and supplies/materials including but not limited to:
 
CLEARING AND GRUBBING/DEMOLITION, EROSION CONTROL, FENCING, TRAFFFIC CONTROL SYSTEMS, TRUCKING, WATER TRUCKS, STREET SWEEPING.
 
Plans and specifications may be reviewed at our offices located at 11555 Dublin Boulevard, Dublin, CA or 7700 College Town Drive, Sacramento, CA, or at your local Builders Exchange, or reviewed and downloaded from the ftp site at ftp://ftp%25desilvagates.com:f7pa55wd@pub.desilvagates.com (if prompted the username is ftp@desilvagates.com and password is f7pa55wd) or from the Owner’s site.
 
Fax your bid to (925) 803-4263 to the attention of Estimator Jack Shewmaker. If you have questions for the Estimator, call at (925) 829-9220.  When submitting any public works bid please include your DUNS number and DIR number.  For questions regarding registration for DIR use the link at www.dir.ca.gov/Public-Works/PublicWorks.html
 
If you need SBE/DVBE support services and assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies or related assistance or services, for this project call the Estimator at (925) 829-9220, or contact your local Small Business Development Center Network (http://californiasbdc.org) or contact the California Southwest Transportation Resource Center (www.transportation.gov/osdbu/SBTRCs). DGC is willing to breakout portions of work to increase the expectation of meeting the SBE/DVBE goal.
 
At our discretion, 100% Payment and 100% Performance bonds may be required as a subcontract condition. This will be a PREVAILING WAGE JOB. DGC is an Equal Opportunity/Affirmative Action Employer.
 

DeSilva Gates Construction (DGC) - SEDIMENT REMOVAL 2020 TISDALE BYPASS


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


 


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 36







 

© 2020 Small Business Exchange, Inc.