Bid Requests

 



Project Name:
   Bernal Dwellings Rehab DIV 1-33
Location:          San Francisco, California
Bid Date:          October 23, 2019 @2:00pm
Pre-Bid:            October 7, 2019 @10:00am
Labor Reqs:       Prevailing Wage
Est. Start:          December 2019
Est. Completion: August 2021

Nibbi Brothers has been selected as the General Contractor for the Bernal Dwellings RAD Phase 3 project in San Francisco.  We are in receipt of the 90% CD Set and are currently requesting bid proposals from qualified subcontractors including those certified with SBE’s for DIV 1-12 & 21-33.  The Contract Monitoring Division (CMD) has set the SBE participation goal for this project at 25%. All SBE and/or Non-SBE with SBE participation are strongly encouraged to submit.  For more information about the San Francisco SBE program as it relates to this solicitation, please contact Mr. Romulus Asenloo at the City and County of San Francisco Contract Monitoring Division via email, ian.fernando@sfgov.org.

MOH , Section 3 HUD / Additional local hiring goals:

Contractors are required to work in good faith with the City’s Office of Economic and Workforce Development (OEWD) to employ disadvantaged workers to meet the following hiring goals:

·       30% of all work hours are performed by Section 3 residents

·       30% of new-hire opportunities are fulfilled by Section 3 residents

·       6.9% of all work hours by trade are performed by female workers

·       25.6% of all work hours by trade are performed by minority workers

    
The Bernal Dwellings RAD Phase 3 project is located at the intersection of Cesar Chavez and Harrison Street, originally constructed in 1998-2001. The 4-acre site contains two private access roads, Kamille Court and Treat Lane, which define four blocks on the parcel. There are 17 existing slab-on-grade non-elevator R-2 primary use buildings comprised of TJ floor joists and manufactured wood trusses. Buildings are connected by exterior privacy walls on each block which enclose “garden courts” and private rear yards with wood fences at the center of each block.  Residential buildings have exterior concrete patios at grade and wood deck balconies with metal guardrails serving each dwelling unit.  All existing buildings are comprised of painted cement plaster and cement board lap siding exterior finishes, metal frame windows, and pitched roofs with asphalt shingles, fascia/eaves, metal gutters and downspourts. All ground floor residential apartments and common area amenities were approved in 1998 for accessibility compliance with California T-24. According to a recent third-party RAD Physical Conditions Assessment, most existing units are categorized as fair to good condition.  All buildings contain existing dwelling units for interior rehabilitation and modernization totaling 160 residential dwelling units, comprised of 50 flats and 6 townhouses at grade and 104 walk-up townhouses occupying the second and third floors where occurs.  The proposed project scope includes interior improvements at the ground floor of Building 10 and Building 12. Site improvements are limited to areas of sidewalk re-grading at accessible routes, and three off-street accessible parking spaces adjacent to Building 12.

IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT KRISTIN MEDWICK VIA EMAIL, KRISTINM@NIBBI.COM


Nibbi Brothers - Bernal Dwellings Rehab DIV 1-33


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


 


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 34







 

© 2019 Small Business Exchange, Inc.