PMI requests proposals/quotes from all qualified and certified Disadvantage Business Enterprise (DBE) subcontractors, suppliers, and truckers for the following project:                       

Embarcadero Station Platform Elevator Capacity and Redundancy Project
BART CONTRACT NO. 11FE-110
bids:  10/29/2018 @ 2 pm
DBE GOAL – 22%

The work includes but is not limited to: Selective Demo; Portland Cement Concrete; Conc Forming/ Falsework/ Accessories; Waterstops; Rebar; Cast-In-Place Conc; Precast Conc; Non-Shrink Grout; Conc Unit Masonry; Mtl Welding; Structural Steel Framing; Mtl Decking; Cold-Formed Mtl Framing; Mtl Fabrication; Mtl Stairs & Railings; Decorative Mtl; Rough Carpentry; Crystalline Waterproofing; Vapor Retarders; Flashing & Sheet Metal; Roof & Wall Specialties & Accessories; Cementitious / Intumescent Fireproofing; Firestopping; Joint Protection; Mtl Doors & Frames; Access Doors & Panels; Door Hdwr; Glazing; Fire-Rated Glass & Framing; Gypsum Board; Stone Flooring; Painting; Signage; Illuminated Cabinet Signage; Safety Specialties; Electric Traction & Hydraulic Elevators; Plumbing & HVAC Insulation; Indoor Cabinets, Racks, Frames & Enclosures; Electronic Circuits, Wires and Cables, Wet-Pipe Sprinkler System; Storm Drainage; Sump Pumps; Testing, Low Voltage Wires & Cable; Electrical Cabinets & Enclosures; Circuit Breakers & Panelboards; Lighting; Telephone Systems; Fire Detection & Alarm System; CCTV; Traction Power Cables

Bonding, insurance, lines of credit and any technical assistance or information related to the plans & specifications & requirements for the work will be made available to interested DBE certified suppliers & subcontractors. 

Assistance with obtaining necessary equipment, supplies, materials, or related assistance or services for this project will also be offered to interested DBE certified suppliers, subcontractors, truckers.  PMI is signatory to the Operating Engineers, Carpenters, and Laborers Collective Bargaining Agreements.

100% Payment & Performance bonds will be required from a single, Treasury-listed surety company subject to PMI’s approval.  PMI will pay bond premium up to 1.5%.  Subcontractors awarded on any project will be on PMI’s standard form for subcontract without any modifications.  For questions or assistance required on the above, please call.

We are an Equal Opportunity Employer

 

 


PROVEN MANAGEMENT, INC. - Embarcadero Station Platform Elevator Capacity and Redundancy Project


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


 


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 34







 

© 2019 Small Business Exchange, Inc.