Bid Requests

 

REQUESTS QUOTATIONS FROM ALL CERTIFIED SLDBE FIRMS:
LOCAL AND NON-LOCAL SBE, MBE, WBE, DBE AND DVBE SUBCONTRACTORS & SUPPLIERS
and ALL QUALIFIED SUBCONTRACTORS & SUPPLIERS
FOR ALL TRADES FOR THE FOLLOWING PROJECT:

SOLANO COMMUNITY COLLEGE LIBRARY/LEARNING RESOURCE CENTER
FAIRFIELD, CA
SCCD PROJECT # 19-009
BID DATE: September 25 @ 2:00pm
ESTIMATE: $34,000,000
 
Trades needed but not limited to: Abatement, Demolition, Grading & Paving, Site Utilities, Landscape & Irrigation, Hydroseeding, Concrete, Rebar, Electrical, Electrical Underground Ducts & Manholes, Medium Voltage Wiring, Structural Steel & Misc. Metals, Metal Decking, Precast Concrete, Doors, Frames & Hardware, Install Doors Frames & Hardware, Aluminum, Glass & Glazing, Skylights, Overhead Coiling Doors & Grilles, Finish Carpenter, Casework, Library Stacks System, Book Depositories & Theft Equipment, Window Washing System, Metal Stud & Drywall, Building Insulation, Metal Wall Panels, Fiber Reinforced Polymer Rainscreen, Waterproofing & Air Barrier, Ceramic Tile, Acoustical Ceilings, Wall Coverings, Wall & Door Protection, Visual Display Boards, Metal Lockers, Flooring, Painting, HVAC, Sheet Metal Flashing & Trim, Plumbing, Thermoplastic Roofing, Fire Sprinkler, Hydraulic Elevators, Fire Stopping, Joint Sealants, Access Doors, Roof Accessories, Vapor Testing, Signage, Toilet Compartments & Accessories, Fire Protection Specialties, Residential Appliances, Window Blinds, Roller Window Shades, Clocks, Site Furnishing & Accessories, Bird Control.

CONTACT: Kelsey Godfrey bid@arntzbuilders.com 

All contractors shall be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5 to be qualified to bid on, be listed in a bid proposal (submitted on or after March 1, 2015) or be awarded a contract for public work on a public works project (awarded on or after April 1, 2015).  In addition, they are subject to the requirements of Section 4104 of the Public Contract Code.
 
BONDING, INSURANCE, TECHNICAL ASSISTANCE AVAILABLE. PLANS AVAILABLE IN GC’S PLAN ROOM. SUCCESSFUL SUBCONTRACTORS WILL BE REQUIRED TO SIGN ARNTZ BUILDERS, INC. STANDARD SUBCONTRACT AGREEMENT WHICH INCLUDES ARNTZ BUILDERS, INC. REQUIREMENT THAT SUBCONTRACTORS PROVIDE A100% FAITHFUL PERFORMANCE AND PAYMENT BOND OF THE SUBCONTRACT PRICE FROM A TREASURY LISTED SURETY COMPANY ACCEPTABE TO ARNTZ BUILDERS.  BOND PREMIUM TO BE INCLUDED IN BID AS A SEPARATE ITEM. SUBCONTRACTORS WILL BE REQUIRED TO PROVIDE A WAIVER OF SUBROGATION ENDORSEMENT TO THEIR
WORKERS COMPENSATION INSURANCE.
 
WE ARE SIGNATORY TO THE CARPENTER’S AND LABORER’S
COLLECTIVE BARGAINING AGREEMENTS
AN EQUAL OPPORTUNITY EMPLOYER


ARNTZ BUILDERS, INC - SOLANO COMMUNITY COLLEGE LIBRARY/LEARNING RESOURCE CENTER


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


 


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 34







 

© 2019 Small Business Exchange, Inc.