Bid Requests

 


Owner: Metropolitan Water District of Southern California
Project Name: Pure Water Southern California Direct Potable Reuse Testing Facility
Bid Date: November 3, 2026
Request for SBE, DVBE, MBE, WBE, OBE sub-quotes
 
Kiewit Infrastructure West Co. (Kiewit) is seeking sub-quotes from qualified, Small/Disabled Veteran Business Enterprise (S/DVBE), including Small Business Enterprises (SBE), Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Labor Surplus Area firms; and all other business enterprises to perform as Subcontractors and Material Vendors/Suppliers. S/DVBEs must be certified by one of the following agencies prior to bid opening: valid Metropolitan Water District issued Small Business Certification letter and a valid Small Business Enterprise Certification letter from the State of California Department of General Services (DGS) certifying organization.
 
This solicitation is specifically for Phase 1 – Preconstruction Services under Metropolitan's Construction Manager/General Contractor (CM/GC) contract. Kiewit is seeking qualified firms to support preconstruction activities, including but not limited to the following scopes:
 
BIM Modeling (NAICS 541330, 541310, 541340), Integrator (NAICS 541512, 238210), Scheduling (NAICS 236220, 561110) and Permitting (NAICS 541199, 541611).
 
Project is funded primarily funded by Metropolitan’s CIP, as well as a potential combination of local, state, and federal funding.  These may include United States Bureau of Reclamation (USBR), and State of California’s State Water Resource Control Boards (SWRCB). 
 
Contracting requirements apply to this project, including American Iron and Steel, BABA, California prevailing wages, and David Bacon.
 
Firms interested in providing a sub-quote for this project must contact Kiewit and responding firms will be issued an “Invitation to Bid” through Kiewit’s electronic use of Building Connected system (at no cost to bidder) with project information and bid instructions. Plans and specifications are also available for review at Kiewit’s office located at 3090 Bristol Street, Suite 600, Costa Mesa, CA 92626.
 
Responsive bidders must possess a valid California Contractor’s license (as appropriate) and provide acceptable insurance. Responsible subcontractors and material contractors will be required to provide bonding for 100% of their contract value where applicable to the scope of services. Kiewit will reimburse bond premiums. Kiewit is signatory to collective bargaining agreements with carpenters, laborers, cement masons, ironworkers, operating engineers and teamsters.  Kiewit will consider quotes from any, and all bidders who demonstrate an ability to foster and maintain labor harmony on the Project.
 
Kiewitintends to conduct itself in good faith with all participants on this project. For further information regarding this project, licensing, insurance, bonding, related assistance with equipment, supplies, and materials, or the project schedule, please contact our Lead Estimator.


Kiewit Infrastructure West Co.
3090 Bristol Street, Suite 600, Costa Mesa, CA 92626
Tel: (714) 845-1600
Lead Estimator Contact: Sepideh “Sippy” Aria |Email: Sepideh.aria@kiewit.com
“Kiewit Infrastructure West Co. is an Equal Opportunity Employer.

 

Kiewit Infrastructure West Co. - Pure Water Southern California Direct Potable Reuse Testing Facility


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


  Twitter X icon


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 42







 

© 2026 Small Business Exchange, Inc.