Bid RequestsPROJECT NAME: City of Sunnyvale Cleanwater Center and Perimeter Wall Project Water Pollution Control Plant, 1444 Borregas Ave, Sunnyvale, CA 94089 DOCUMENTS TO BE RELEASED: October 19, 2026. BID DUE DATE: November 9, 2026 at 2:00 PM. Include ALL completed Bid forms. Swinerton is requesting quotations from All Subcontractors and Certified DBE’s. Trades: All Trades: Hazardous Materials Abatement, Demolition, Earthwork & Grading, Ground Improvement, Slurry Wall, Shoring, Site Utilities (Wet & Dry), Cast-in-Place Concrete (Flood Wall & Building), Reinforcing Steel, Structural Steel & Miscellaneous Metals, Waterproofing, Roofing, Sheet Metal / Flashing, Sealants, Doors Frames & Hardware, Glazing, Metal Framing & Drywall, Plaster, Tile, Flooring, Acoustical Ceilings, Painting, Lab Casework & Fume Hoods, Millwork, Specialties, Signage, Lockers, Window Treatments, Elevator, Fire Sprinklers, Plumbing, HVAC, Electrical, Fire Alarm, Low Voltage / IT / Security, Hydrostatic Flood Gates, Security Fencing & Gates, Temporary Modular Trailers, Traffic Control, SWPPP, Asphalt Paving & Striping, Site Concrete, and Landscaping & Irrigation. RFIs Due: October 30, 2026, 4 PM. Project Description: Swinerton is bidding this project for the City of Sunnyvale. This bid is for award (Invitation for Bids #PW27-05, Public Works Project No. UY-19-02). City estimate: approximately $68.5M. The City of Sunnyvale is rebuilding its Water Pollution Control Plant under the Cleanwater Program. This project includes a new perimeter flood wall, abatement and demolition of the existing administration building, temporary trailers to house staff during construction, and a new two-story, ~30,000 sf administrative, laboratory and maintenance building (the Cleanwater Center), designed to LEED Gold equivalency. Part of the flood wall is a “Joint Wall” cost-shared with Santa Clara Valley Water, requiring a Bay Trail detour and compliance with BCDC permit requirements. Additional scope includes security fencing on the wall, hydrostatic flood gates, utility relocations and new utilities, IT/networking, landscaping, and site and roadway improvements within the plant, along Carl Road, and at the Recycle Yard. The work will be released in two phases: NTP No. 1 (Joint Wall, temporary trailers and 48-inch valve; 400 calendar days, anticipated early 2027) and NTP No. 2 (all remaining work, starting June 1, 2028; 999 calendar days). PLANS & SPECIFICATIONS: https://app.buildingconnected.com/public/565395ced928350a00e70b61 Contact: Obie Marroquin Tel: (408) 769-8629 EMAIL TO: Obie.Marroquin@swinerton.com · This is a Public Works project financed in part by the SWRCB Clean Water State Revolving Fund (CWSRF) and the U.S. EPA Water Infrastructure Finance and Innovation Act (WIFIA). Subcontractor must be registered with the CA Department of Industrial Relations before submitting a bid. Application and renewal are completed online with an annual, non-refundable fee. · Davis?Bacon Act Requirements and Wage Determinations shall apply to this contract, along with California prevailing wage rates (the higher rate governs). · American Iron and Steel (AIS) requirements apply to iron and steel products under the CWSRF/WIFIA funding. · DBE participation is encouraged and DBE Good Faith Efforts are required. The City also encourages use of local (Santa Clara County) workforce and State-certified apprentices. · Award will be made to the lowest responsive, responsible bidder. Optional pre-bid site visit: October 28, 2026 at 1:00 PM at the plant (Gate C); sub-bidders are encouraged to attend. Hard hat and hard-soled boots required; limit 3 people per company. · All Swinerton subcontractors will need to be prequalilfied with Swinerton prior to execution of subcontracts. · Please follow the this link to Swinerton prequalification to get started if your company is not already prequalified. https://swinerton.com/subcontractor-prequalification/#existing We reserve the right to require all subcontractors to furnish 100% performance and payment bonds from a U.S. Treasury-listed surety. Premium cost to be included as a separate item. At our discretion, a bid bond and/or letter of bondability from a U.S. Treasury-listed surety may be required within 48 hours of demand. “Swinerton is an Equal Employment Opportunity, Minority, Women, Disability, and Veteran Employer” Swinerton Builders - City of Sunnyvale Cleanwater Center and Perimeter Wall Project Water Pollution Control Plant Email To Friend« Go Back |
||
|
|
||
|
© 2026 Small Business Exchange, Inc. |
||











