Bid Requests

 


Garney Pacific, Inc. is bidding the Purified Water Replenishment San Jacinto Advanced Water Purification Facility Projectas a general contractor and is actively seeking DBE participation, including but not limited to firms with MBE, WBE, or SBE certifications.

PROJECT: Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility

OWNER: Eastern Municipal Water District

LOCATION: San Jacinto, CA
BID DATE: October 20, 2026, by 10:00AM PT
QUOTES DUE BY: October 20, 2026, by 10:00AM PT
 
PROJECT DESCRIPTION: The purpose of this project is to recharge the San Jacinto groundwater basin with a blend of advanced treated water and recycled water. The project consists of civil/site work, process building construction, installation of advanced membrane treatment equipment (UF and RO systems), process piping, underground utilities, and final testing/startupto deliver a complete operational water treatment facility. The Brine Ponds portion of the project includes site preparation, civil improvements, installation of lined evaporation ponds, mechanical systems, and all associated electrical, instrumentation, and controls required for operation.
 
We are requesting quotes for the following types of work:
 
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Precast, Asphalt Paving, Excavation Shoring, Earthwork, Aggregates, Erosion Control, Landscaping, Fencing, Reinforcing Steel, Concrete Supply, Concrete Formwork, Masonry, Misc. Metals, Pre-Engineered Metal Building Installation, FRP Fabrications, Thermal Insulation, Roofing, Roof Accessories (Skylights/Curbs/Hatches)
Hollow Metal Doors, Windows, Painting, Insulation, Coatings, Overhead Doors, Glazing, Metal Studs/Gypsum Board, Flooring, Coatings, Building Specialties, Louvers, Signage, Process Equipment (Pumps/Chemical Feed/Filter/GAC/HDPE Tanks), Lab Equipment, Wood Casework, Cathodic Protection, Welded Steel Tanks, Instrumentation, Process Piping & Valves, Pipe Supports, HVAC, Plumbing, Electrical
 
NAICS: 327390, 327331, 327332, 237310, 238910, 238990, 238910, 327992, 423320,541330,561730,238990,331110,327320,423320,238140,332999, 331491,238190, 236220,326199, 423390,238310,238160,332321, 332321, 321911,332321, 321911, 238150,238320,238310, 238390,238930,238290,238150,238130, 238310,238330,238390, 238190,332322,339950, 423440,334513, 332420, 423830,334516, 423490, 238390,337110, 238350,238190, 335999,238910, 237110,334513, 334610,332919, 423840, 334513,332919, 332996,238220,238220,238210

Please let us know if you need work items separated into smaller tasks or quantities to allow your participation. If you require an additional breakdown of an item or have other areas you are interested in bidding, please reach out to us to discuss available options. We will accommodate requests whenever possible and when economically feasible.
 
Garney Pacific, Inc. is a union contractor and all subcontractors on the project must utilize union labor. Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney, unless the project documents note otherwise. Please contact us for any insurance, bonding or other project-related questions.

In accordance with Appendix I, and as part of Garney's Good Faith Effort requirements, all subcontractors and suppliers that plan to subcontract any portion of their scope are required to perform and document Steps 1 through 5 of the Six Good Faith Efforts.

Garney Standard PO & Subcontract Forms: Standard Purchase Order and Subcontract documents can be downloaded with the bid documents. These documents will be used as the basis of contracting with Garney for the above-mentioned project. If you have any exceptions to these documents, please send redlines and comments with your quote.

Garney Pacific, Inc. is an Equal Opportunity Employer and is available to assist where needed. We strongly encourage all DBE firms interested in this project to submit a competitive bid. Garney fully intends to meet or exceed the participation requirements for this project and is prepared to assist all subcontracting firms in achieving their highest quality of work while maintaining the industry’s most competitive values.

Current DBE certification from one of the following will be required with your bid: U.S. Small Business Administration, U.S. Dept. of Transportation, a Tribal, State, or local government certification issued in accordance with EPA's 8% or 10% statutory disadvantage standard, or an independent private organization certification issued in accordance with EPA's 8% or 10% statutory disadvantage standard.

Bid Documents are available through our website at https://www.garney.com/upcoming-bids/. Please contact Alyssa Callaway at alyssa.callaway@garney.com with any questions.
Garney Pacific, Inc. is signatory to Laborers & Operators unions.

Garney Pacific, Inc. - Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


  Twitter X icon


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 42







 

© 2026 Small Business Exchange, Inc.