Bid Requests

 
W.A. Rasic Energy and Infrastructure Services, Inc. is preparing a bid for the following project as a prime contractor and we are interested in receiving subcontractor quotations for items of work or materials required below from interested Disadvantaged Business Enterprise (DBE), Minority Business Enterprise (MBE), Women Business Enterprise (WBE) and Other Business Enterprise (OBE).
 
Los Angeles Department of Water & Power
Western Trunk Line – Phase 1
Bid No. 7972R1
Bid Date: July 30, 2026 @ 2:00 PM
Outreach: DBE/ MBE/WBE/OBE
Senior Estimator: Ben Sebat (562) 928-6111
Email: bsebat@warasic.com
 
W.A. Rasic Energy and Infrastructure Services is requesting bids for the following trades and/or material supplies:
Asphalt Cold Milling & Cap Paving, Traffic Signals, Sawcutting, Striping, Welding, Furnish Welded Steel Pipe, Furnish Earthquake Resistant Ductile Iron Pipe, Waterworks Supply, Furnish Aggregate Supply, Furnish Ready Mix Supply, Furnish Fiber Optic Conduit & Pull Box Supply, Trenchless Construction, Cathodic Protection, Trucking & Disposal, Welding Inspection, Survey, Cathodic Protection, Shoring, Equipment Rental
 
NAICS Codes:
212321, 237310, 237990, 238190, 238210, 238990, 327320, 331210, 332996, 484110, 532412, 541370, 541690
 
Plans & Specifications are available to review Monday through Friday 8:00 am to 5:00 pm at no cost at our office located at 4150 Long Beach Blvd, Long Beach, Ca 90807.
 
W.A. Rasic Energy and Infrastructures Services, Inc. intends to seriously negotiate with qualified firms and will assist in obtaining bonds, lines of credit, insurance, equipment, supplies and materials upon request. W.A. Rasic Energy and Infrastructure Services, Inc. will consider all DBE, MBE, WBE and OBE quotes, including those that are broken down into economically feasible tasks or quantities as well as arrange delivery schedules to facilitate and encourage maximum bidding participation. W.A. Rasic Energy and Infrastructure Services, Inc. also encourages a consortium of DBE / MBE / WBE / OBE firms when a contract portion is too large to handle individually. Subcontractors must have a valid California Contractors License and must be registered with the Department of Industrial Relations (DIR) as required by Section 1725.5 of the Public Contract Code. Subcontractors will be required to execute W.A Rasic Energy and Infrastructure Services, Inc.’s standard subcontract agreement and general insurance requirements. A copy of our subcontractor agreement and insurance requirements is available in electronic format upon request. W.A. Rasic Energy and Infrastructure Services reserves the right to require each subcontractor to provide payment and performance bonds in the amount of 100% of the subcontractor’s bid. Bond Premium will be reimbursed up to a cost not to exceed 1.5%. W.A. Rasic Energy and Infrastructure Services is an equal opportunity employer and Union signatory Contractor.
 

W.A. Rasic Energy and Infrastructure Services, Inc. - Western Trunk Line – Phase 1 Bid No. 7972R1


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


  Twitter X icon


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 42







 

© 2026 Small Business Exchange, Inc.