Bid Requests
Request for certified / Self Certified SBE, SDB, WOSB, VOSB, SDVOSB, HUBZone Subcontractors/ Suppliers to provide quotes for:
Project Name: Las Pulgas Landfill Corrective Action Plan Implementation Phase I Liner Reconstruction and Phase II Liner Repairs Project ID: N62473-24-R-1201 Owner: NAVFAC Southwest Estimated Project Value: $10,000,000-$25,000,000 Subcontractors/Subconsultants/ wanted for the following trades: Subcontractor- Demolition, Survey, QAQC, Biologist, Liner Sub, Export Trucking Supplier-LPSL (Leachate Collection and Removal), Geotextile, HDPE, Protective Cover Soil, PVC, Aggregates, Erosion Control Materials, Rebar, Clay Project Scope: This project, titled "Corrective Action Plan Implementation Phase I Liner Reconstruction and Phase II Liner Repairs" (Project No. PE20E10M, Contract No. N62473-24-R-1201), is located at the Las Pulgas Landfill, MCB Camp Pendleton, San Diego, California. Its primary objective is to remove the failed Phase I toe and slope liner systems, the compromised interface with the Phase II slope liner, the complete Leachate Collection and Removal System (LCRS), and the associated LCRS subdrain system. Following removal, these systems will be reconstructed in full compliance with the Corrective Action Plan (CAP), the San Diego Regional Water Quality Control Board (RWQCB) Waste Discharge Requirements, Order No. R9-2011-039, and California Code of Regulations (CCR) Title 27. The scope includes reconstructing the Phase I liner system (approximately 240,000 square feet) and repairing the Phase II area damaged during prior Phase I slope liner construction. The period of performance is 420 calendar days from task order award. BID DATE: July 2nd at 2PM State License Number 507561 1383 South Signal Drive, Pomona, CA 91766 Contact: Brenda Martinez PH: 909.622.2259 Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance. Reyes Construction, Inc. is signatory to the following unions: Teamsters, Operators, Cement Masons, Carpenters and Laborers. For information on the availability of scope of work, plans, and specifications, please contact our office. Plans, Specifications, and Contract requirements can be viewed at no additional cost: 1) Via BuildingConnected – please send an email request to estimating@reyesconstruction.com 2) In person at Reyes Construction Headquarters (please email for appointment) Reyes Construction Inc - Las Pulgas Landfill Corrective Action Plan Implementation Phase I Liner Reconstruction and Phase II Liner Repairs Email To Friend« Go Back |
||
|
|
||
|
© 2026 Small Business Exchange, Inc. |
||











