Bid Requests
Glosage Engineering Inc.
590 S 33rd St. Richmond, CA 94804 DBE Subcontractor Requested For: Oro Loma Sanitary District Sewer Collection System Pipeline Rehabilitation and Replacement Project Phase 10 Project No: 45-146.10 BID DATE: May 14th, 2026, at 2:00 pm Email quotes to: guzmancrp@outlook.com The project work is generally described as: PHASE 10: The project work is generally described as: the replacement of 13,016 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 1,733 linear feet of 8-inch VCP with 10-inch HDPE pipe; 279 linear feet of 12- inch VCP with 12-inch HDPE pipe; 414 linear feet of 15-inch VCP with 18-inch HDPE pipe and the reconnection of all laterals and re-channelization of all manholes, as shown on the plans and specifications. Glosage Engineering Inc requests qualified DBE subcontractors and suppliers in the following scopes of work: Saw cutting and drilling, removal of hazardous waste, concrete flat work, supplies/ materials, equipment, traffic control. Plans and Specifications are available to download on https://orolomasanitarydistrict.ca.gov/. You may contact Luis Guzman at 510-815-4505 or guzmancrp@outlook.com to get on our subcontractor list. Should you require assistance with bid or have any questions please feel free to reach out. Glosage Engineering Inc. - Sewer Collection System Pipeline Rehabilitation and Replacement Project Phase 10 Email To Friend« Go Back |
||
|
|
||
|
© 2026 Small Business Exchange, Inc. |
||











