Bid RequestsOwner: Elsinore Valley Municipal Water District Project Name: Canyon Lake Water Treatment Plant Design-Build; Work Order No. C2001 Location: Lake Elsinore, CA Bid Date: June 24, 2026, at 2:00pm PDT Project Quotes due 5/18/2026 Request for DBE sub-quotes Kiewit Infrastructure West Co. (“Kiewit”) is seeking quotes from qualified Disadvantaged Business Enterprises (DBE) firms, including Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Small Business Enterprise (SBE), Small Business in Rural Area (SBRA), Labor Surplus Area Firm (LSAF), Historically Underutilized Business (HUB) firms; and all other business enterprises to perform as subcontractors, material contractors, and suppliers. DBES must be certified by one of the following agencies prior to bid opening: The US Environmental Protection Agency (USEPA), The Small Business Administration (SBA), California Department of Transportation (CalTrans), Tribal, State and Local governments, or an independent private certifying organization. Kiewit is requesting quotes for various areas of work listed in, but not limited to, the scopes of work below. Surveying, quality control testing, demolition, aggregates, geosynthetic materials, asbestos and lead abatement, subsurface investigation equipment (vac trucks), dirt and concrete rubble disposal landfills, shoring, utilities cathodic protection, plastic pipe, plastic polyethylene pipe, pre-cast manholes for sewer and storm drain, asphalt paving, curbs and gutter, fencing, ready mix supply, concrete reinforcing supply and installation, concrete pumping, shotcrete, concrete saw-cutting, masonry work, miscellaneous structural metals, field welding services for misc. metals and steel pipe, steel pipe, metal deck, damp proofing and waterproofing, flashing and sheet metal, sheet metal roofing, metal doors and frames, overhead door, windows, painting and coatings, louvers and vents, water supply and treatment equipment, chemical feed equipment, chemical equipment, pre-engineered structure, hangers and support, mechanical insulation, valves, heating, ventilation and air conditioning. Firms interested in receiving a bid package for this project must contact us at the e-mail address noted. Kiewit will provide project information and bid instructions. If your company is interested in the project, please contact us before the quotes due date of 5/18/26 to coordinate. This project is publicly funded in whole or part with funds through the Clean Water State Revolving Fund (CWSRF) administered by the EPA and is therefore subject to the American Iron and Steel (“AIS”) Provisions, DBE Program requirements and the Davis-Bacon Related Acts. Responsive bidders must possess a valid California Contractor’s license (as appropriate), be registered with the Department of Industrial Relations (DIR) and provide acceptable insurance. Responsible subcontractors and material contractors may be required to provide bonding for 100% of their contract value. Kiewit will reimburse bond premiums. Firms performing any onsite work are subject to prevailing wages requirements. Kiewit will consider quotes from any, and all bidders who demonstrate an ability to foster and maintain labor harmony on the Project. Kiewit intends to conduct itself in good faith with all project participants on this project. For further information regarding this project, licensing, insurance or bonding, equipment, supplies, materials, or related assistance or services or project schedule, please contact the Lead Estimator listed below. Kiewit Infrastructure West Co. 10704 Shoemaker Ave., Santa Fe Springs, CA 90670 Tel: (562) 946-1816 • Fax: (562) 946-3823 Contact : Edwin Aleman Email: Socalestimating@Kiewit.com and edwin.aleman@kiewit.com Kiewit Infrastructure West Co. is an Equal Opportunity Employer. Kiewit Infrastructure West Co. - Canyon Lake Water Treatment Plant Design-Build; Work Order No. C2001 Email To Friend« Go Back |
||
|
|
||
|
© 2026 Small Business Exchange, Inc. |
||











