Bid Requests

 

Garney Pacific, Inc. is soliciting sub bids from qualified MBE/WBE/SBE/DBE firms for the San Leandro Channel Crossing Pipeline for East Bay Municipal Utility District.
 
Bids are due February 4, 2026 at 2:00 PM.
 
We are requesting quotes for trades including, but not limited to the following: SWPPP/Erosion Control 541330 | Cathodic Protection 238190, 335999 | Asphalt Paving 237310 | Traffic Control 532490, 561990 | Saw Cutting 238910, 238990 | Trucking 484110, 484121 |Aggregate Supply 327992 |Shoring 238990 |Concrete Supply 327320 |Steel Pipe Supply 332996, 331110 | HDPE Pipe Supply 332996, 331110 |HDPE Fusion Services 238190 |Waterworks Materials 332911 |Concrete Sidewalk Replacement 238110,238190 | Striping 237310 |Tree Trimming 561730 |Dewatering 238910 | Temporary Fencing/Soundwalls 238990 |Geotechincal Instrumentation/Monitoring 541380 |Welding 238190 |Geotechnical Fabric 541380 |Hazardous Material Disposal 562211, 562910 |Quality Control Testing 334513, 924110

Brief Scope of Work:
Furnish and install approximately 2,100 linear feet of 24-inch mortar lined and coated steel (ML&CS) pipe and 1,500 linear feet of 24-inch mortar lined and plastic-coated steel (ML&PCS) pipe, including all connection piping, appurtenances and fittings in Alameda, CA.
 
Visit https://www.garney.com/upcoming-bids/or East Bay Municipal Utility District :: Construction bids for access to the bid documents for this project.
 
Garney Pacific, Inc. is an Equal Opportunity Employer and is available to offer assistance where needed. We strongly encourage all MBE/WBE/SBE/DBE firms interested in this project to submit a competitive bid. Garney fully intends to meet or exceed the participation requirements for this project and is prepared to assist all subcontracting firms in achieving their highest quality of work while maintaining the industry’s most competitive values.
 
Garney Pacific, Inc. is a union contractor, all subcontractors on the project must utilize union labor.  Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse Subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney Pacific unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. Garney Pacific, Inc. is a signatory to Laborers & Operators unions.
Further information is available by contacting alyssa.callaway@garney.com.

Garney Pacific, Inc. - San Leandro Channel Crossing Pipeline for East Bay Municipal Utility District


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Connect with us


  Twitter X icon


Tappan Zee Constructors


KWM Goethals
John P. Picone
Skanska
Kiewit

Railroad Construction Company
J. F. Shea
Sovereign Publishing

SBE 41







 

© 2026 Small Business Exchange, Inc.