Bid Requests
555 Exchange Court, Livermore, CA 94550 (925) 373-8370, Fax (925) 373-0940
INVITATION TO BID Project: Main Wastewater Treatment Plant Digesters 7, 11 & 12 Rehabilitation Specification SD-450 Owner: East Bay Municipal Utility District Bid Date: August 13th 2025 @ 2:00 P.M. Engineers Estimate: $10,000,000- 12,000,000 We are requesting quotes from all qualified DBE/ MBE/ WBE Subcontractors and Suppliers but not limited to: PIPE SUPPLIERS, STEEL PIPE SUPPLIERS, ELECTRICAL- BUILDING, FALSEWORK/ SCAFFOLDING/ FORMWORK, PIPE INSULATION, CONCRETE REPAIR, HVAC/ MECHANICAL, PAINTINGS/ COATINS, ROOFING, VALVES GUYS Project Description: Work includes the following: (1) remove and replace linings (or coatings) on digester internal steel and concrete surfaces. (2) Electrical and instrumentation work required to replace or modify digester overflow temperature sensors for each digester. (3) Structural repair work on the underside (inside) of the Digester 12 cover. (4) Remove and install new digester insulated roofing system on Digester 10 and spot repair of roof insulation at specific digesters. (5) Install new Class 1 Division 2 wiring, panels, and controls equipment at the flares. (6) install HVAC system in the Dewatering Building. (7) area gas monitor sensors, and (8) other miscellaneous improvements in and around the digesters. Project information, including plans & specifications can be found by contacting: http://www.ebmud.com/current-construction-bids or: estimating@mountaincascade.com Please feel free to contact Mountain Cascade, Inc. at 925.373.8370 with any questions concerning bonding, insurance, lines of credit, and job overview. We look forward to your response. Mountain Cascade Inc. is an Equal Opportunity Employer California License # 422496 This is Part of a Good Faith Outreach. Your response is greatly appreciated Mountain Cascade Inc. - Main Wastewater Treatment Plant Digesters 7, 11 & 12 Rehabilitation Email To Friend« Go Back |
||
![]() |
||
© 2025 Small Business Exchange, Inc. |