Bid Requests
Subcontractor/Supplier Bids Requested For:
City of Modesto
River Trunk Realignment – River Trunk Pump Station
BID DATE: Tuesday, July 1st, 2025 at 11am
Total Project Value: $106M
Project Location: Modesto, CA Email quotes to jmiranda@shimmick.com Shimmick Construction Company, Inc. is requesting quotes from qualified subcontractors and suppliers in the following scopes of work, including, but not limited to: AC Paving; Aggregates; Boring; CAS/Roadway Signs; Cathodic Protection; Ceramic Tiling; Clear & Grub; Concrete Formwork; Concrete Pumping; Concrete Repairs; Demolition; Dewatering; Ductwork Insulation; Electrical; Erosion Control; Fencing; Fire Extinguishers; Geotextile Materials; Glass Fiber and Resin Fabrication; Glazing; High-Performance Coatings; Hollow Metal Doors and Frames; HVAC; Instrumentation & Controls; Jib Cranes; Joint Sealants; Joints in Concrete; Landscaping & Irrigation; Louvers; Masonry; Micro tunneling; Minor Concrete; Misc. Metals Iron & Steel; Open Web Steel Joist Framing; Overhead Coiling Doors; Painting; Pipe & Tubing (PVC, Copper HDPE, Plastic, Stainless Steel); Pipe Supports; Piping Insulation; Plastic Liner for Concrete Structures; Plumbing; Pole Camera; Portable Davit Cranes; Quality Control Testing; Ready Mix Concrete; Rebar; Roof and Deck Insulation; Rough Carpentry; Sheet Pile Installation; Sheet Waterproofing; Shoring & Excavation; Shotcrete; Signage; Standing Seam Sheet Metal Roofing; Steel Decking; Street Sweeping; Striping; Structural & Geotechnical Design; Structural Steel Framing; Survey; SWPP Plan & Materials; Temporary Pumping Systems; Toilet Accessories; Traffic Control Design & Implementation; Traffic Control; Trucking; Underground Precast; Underground Utilities; Underhung Single Girder Bridge Crane; Valves; Vibration Monitoring; Water Repellents; Welded Steel Pipe To request a link to download plans and specifications, and to schedule an appointment via Teams to discuss the documents, please contact Jamie Miranda at jmiranda@shimmick.com. Meetings are held during regular business hours. Should you require assistance with your bid, please contact our lead estimator Jason Burden at jburden@shimmick.com. All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator listed above for assistance with breaking down items of work into economically feasible units, with assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or related assistance. 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. Shimmick Construction’s listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com. Shimmick Construction Company, Inc. 1 Harbor Center, Suite 200 Suisun City, CA 94585 Phone (707) 410-5070 License No. 594575, DIR No. 1000001063 Shimmick Construction Company Inc. - River Trunk Realignment – River Trunk Pump Station Email To Friend« Go Back |
||
![]() |
||
© 2025 Small Business Exchange, Inc. |